Here is our budget and finance information for the fiscal year of 2012-2013.

Pdficonsmall Budget and Finance Information for 2012-2013

Pdficonsmall Purchasing Policy

Below is WBSD’s Financial Audits and Internal Control Reports.

Pdficonsmall FY 2011-12 Financial Audit

Pdficonsmall FY 2010-11 Financial Audit

Pdficonsmall FY 2009-10 Financial Audit

WBSD Performance Measurement Report

This report is intended to be an annual report by the West Bay Sanitary District regarding the performance of the District. It includes performance measures that, when taken as a whole, should give the reader a sense of how well the utility is performing and being managed. This report is prepared by management for use by the District’s Board of Directors and by the general public. West Bay Sanitary District maintains a wastewater collection system of approximately 210 miles with a total of 25 employees. Measurements including employee responses were gathered via unscientific survey data that may be greatly influenced by one or two employees due to the small pool of total employees.

Pdficonsmall Performance Measurement Report 2012

Pdficonsmall Performance Measurement Report 2011

WBSD 2011 Collection System Master Plan

The primary purpose of this sewer collection system master plan (Master Plan) is to evaluate the District’s gravity sewer collection system under a specific design storm, using a computerized hydraulic model.

This Master Plan is comprised of eleven chapters, including a sample Capital Improvement Program which is updated and budgeted for annually. The Master Plan also recommends a schedule for maintenance-related replacements of the pipeline and pump station facilities.

The Master Plan was developed to meet the following objectives:

• Evaluate system wide flow characteristics to identify areas contributing to high inflow and infiltration (I&I);
• Assess the existing hydraulic capacity of the collection system, including pipelines and pump stations;
• Evaluate pipeline and pump station condition and replacement needs; and
• Develop a prioritized capital improvement program (CIP) and funding approach to provide an affordable and sustainable level of service to the District’s ratepayers.

Pdficonsmall WBSD Master Plan 2011

WBSD Master Plan Update of 2013

In 2011/12, the District completed a second flow monitoring program to document any flow reductions resulting from the Haven Avenue and other District projects. The hydraulic model was then recalibrated and results re-evaluated to determine whether Master Plan recommendations should be adjusted based on the updated information.

This Technical Memorandum (TM) discusses the 2011/12 flow monitoring data and how this information affected hydraulic model results. This TM also discusses a revised approach to the management and accommodation of wet weather flows, and includes the following sections:

• 2011/12 Flow Monitoring Program and Recalibration of Basin 2B
• Recalibration Results for District Service Area
• Revised Approach to Wet Weather Flow Management
• Updated Capital Improvement Program
• Next Steps

Pdficonsmall WBSD Master Plan Update of 2013

Can't find what you need?

Just give us a call or send us an email and a district representative can get you what you are looking for.


Hours of Operation

Open Weekdays

Monday - Friday

Office Hours

8:00am - 4:00pm

Contact Us

By Phone:

(650) 321 - 0384

By Email:

info@westbaysanitary.org

Faqs

Home Education